The Catamaran Company visited in Paris in early December. The members participating in this tour, where a journey of two factories of Nick Harvey. One of the factories that produced Lagoon 380 Lagoon 440 is. The second is Les Sables product's Lagoon Power 44 Lagoon 420 and Lagoon 500 Hybrid

St. Gilles

The group traveled 4.5 hours to get to the first factory. This particular structure, the construction of the boat was located in St. Gilles and produces Laguna380, together with Lagoon 440 The factory tour showed that the entire process of creating a catamaran full, from beginning to end. Pass a new catamaran of the assembly line every 3.5 days.

The trip started with the process of injection molding. There are two main categories used to ensure maximum rigidity. There are several other ways to enter the lagoon for the structure completely. The molds are supported by large appliances, which gives the shape of the hinge, so employees canconvenient to work on each section. This speeds up the construction process.

Resin is to create material in different ways, depending on the program, as part of the boat, the works. In this phase, the work must move fast while demand for resin hardens rapidly to improve the construction process. If the material solidifies, it has the same strength as steel. Male Utility templates used in any position to dig a hole needs are identified, put tape loopmanaged, and what is not. Something that can be felt in the form of this part of the process is completed, so that developers do not need all the time and all measures be taken in the same area on each catamaran. Areas, the holes are marked with an X.

Through Hardened following form (s) are removed from the mold, there are equipment and are located on the side. If a completed form, has many sharp edges and pieces of fiber with differentPages. These deficiencies are drilled and polished to make nice smooth edges. So the forms will be checked, if an employee is a mistake, mark it with a red numbered days and puts them in a log.

When the ship moves down the assembly line workers to overcome these deficiencies in the finished product is perfect. After the molds were cleaned and assembled, are moved to the assembly line. This part of the plant is a completely separate building.Cranes hanging from the ceiling to move the assembly line of catamarans. The mechanics do not go from station to station. They perform the same function, the boats only go down one line to another station.

Furniture is available in cartons packed separately for each boat. Each boat has a custom layout associated with them. A furniture kit is available for each boat. People who builds the installation of furniture, as much of it as possible outsideCatamaran. Built after each piece of furniture is carefully placed in the boat.

When a boat has been completely built, is outside the factory, and remains there until you are set to be tested in a pool. Crane berths in the pool. The boat is anchored at the origin, pipes connected to the exhaust. This is done to ensure that the fumes are pumped outside the factory, so no one is suffering from carbon monoxide poisoning. Some largepowered scattered around the pool, which simulates the rain and Ocean Spray. During the test, the boat will be monitored and checked for leaks. The water is continuously pumped into the pool, why keep the boat causing the loss of water to cool the engines. Since the engines run waves splash from the pool leads to more water to drain from the pool. When the ship under his control are willing to be crossed in order to be taken to Les Sables docks. This is when the ship is ready for delivery. FinishedThe product is mounted on a truck, where it will be accompanied by three police cars to the port needs. There is only 35 minutes to Les Sables from St. Gilles. The shipping sector is extremely dangerous, as this area has many narrow streets and through a roundabout.

Les Sables

The resort of Les Sables specializes in the construction of Lagoon Power 44's, Lagoon 420, Lagoon 500 and all is done the same in this factory just for the way the boats are alongAssembly Line. In this work, the holes in the shape of a catamaran is shown in the bottom of the plant. This increases the comfort level for developers, because they can not climb and balance on ladders / platforms. Workers the right to board the boat to the factory, instead of up, to enter into the ship. This reduces the time needed to build the boat.

For more information, please visit the http://www.catamarans.com

Related posts:

  1. Dock Ladders Excess Dock used on docks to transfer material or people from ship to dock. They consist of several simple steps. A scale of the sea must be guaranteed in the dock, the wooden platforms, sea walls or stationary docks with floating water lines must be established. Most of these...
  2. Pool Care – Keep clean and clear When it comes to pool maintenance, there are many things you need to think about it. There is regular maintenance, cleaning, provision for losses and much more. What happens if you decide to close the pool for a little 'because of the time? There are two ways to close...
  3. Low Maintenance Salt Water Pools Pools of salt water since 1960 in Australia. Owners of these new, says maintenance practices, the pool, you never go back once you've tried! There are itching, burning eyes or bleached in a bathing suit, with saltwater pool. The old method of reading the pH and chills every time...
  4. When your pool accessories on the Internet Pool accessories are the only thing that every water tank owner to ensure that their families have a wonderful time in the sun should be. Pools are in use, people are the accessories and supplies are needed to improve their experience. Whether it is floating or swimming pool slides,...
  5. Merits and Demerits of an Aluminum Fishing Boat The styles and types of fishing boats are available in various forms today. Everyone has their own use and specifications of their advantages. An aluminum fishing boat is one of them. The size of an aluminum fishing boat can be as small as 10 feet, but up to a large...